PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Started constructing the equipment rack for the Electrical panels Facing East.jpg Started installing temporary protection around the 1st floor Facing South.jpg Welding clips along Column H-1 Facing South.jpg Welding clips at the 4th floor Facing North-East.jpg Finished installing the beams at Elev. 4 and installed metal decking Facing South.jpg